Morning all . I just thought I would send an update on my jubilee rebuild. Frame and suspension has been sand blasted etch primed and undercoated along with various other part's. Tank still to clean out . Head blasted and painted. Casings polished. Lots of nos parts ready to be fitted . New wiring loom and coils . I'm going to fit electronic ignition. I think it makes sense after the work I've done so far . What other parts / alterations will I need regarding the conversion? Not 100% sure on this . This is my first venture into British bikes and I'm still learning as I progress but really enjoying the adventure . I can see the light at the end of the tunnel now . Thanks in advance Graham.
Correct but.
- Log in to post comments
Thanks Alan I'll look into…
Thanks Alan I'll look into that
- Log in to post comments
Oil filter
Fit an oil filter. The clubs spares scheme sells the parts. Also fit drain plugs with magnets, again the club does this with a much improved sump plate. Gearbox and primary chain case would benefit from magnets in the drain plugs, don't know if the club does those.
- Log in to post comments
Thanks John. Good advice…
Thanks John. Good advice that .
- Log in to post comments
Fit electronic and 12V. there could be a major snag with a NEW loom.The original 6V Wipac system had a resistor built in the loom. I have yet to see any remade ORIGINAL loom be safe to use.
12V negates this resistor.